Supervisor
Name
|
|
|
Project
|
|
|
Does
the framing subcontractor have the latest set of architectural plans
including all new revisions?
|
|
|
If so, what is the date printed on this
set?
|
|
|
Does
the framing subcontractor have the latest set of engineering plans
including all new revisions?
|
|
|
If so, what is the date printed on this
set?
|
|
|
Has
the engineer who designed the framing plan been called to inspect
the framing?
|
|
|
Are
we in possession of an inspection from the engineer who designed the
framing with no corrections to be made?
|
|
|
What
items did the engineer request to be changed?
|
|
|
Has
the architect been called to inspect the framing and have all items
been corrected in accordance with his/her report?
|
|
|
What
items did the architect request to be changed?
|
|